No Pier Pressure


We carried out this specialist repair to a set of ornate stone pier caps. A HIAB crane loader was used to safely lift the pier caps for the first part of the project. A scaffolding tower was erected to facilitate the guiding into position of the new pier caps, that were made to match the original pieces.


Our experience with Artemis was wonderful. Everything worked like clockwork.

Gill – Site Supervisor